> ## Documentation Index
> Fetch the complete documentation index at: https://docs.stockshift.io/llms.txt
> Use this file to discover all available pages before exploring further.

# Change a draft engineering change order

> Its reason, description and BOMs are replaced. A BOM left out keeps
the draft the ECO gave it. Needs the `engineering.ecos.manage`
permission, a token with `engineering:write` and a plan with
engineering change orders.



## OpenAPI

````yaml /openapi.json put /engineering/ecos/{eco}
openapi: 3.1.2
info:
  title: StockShift API
  version: 1.0.0
  description: >-
    The StockShift REST API. Start with the guides for authentication, scopes,
    pagination, errors and webhooks.
servers:
  - url: https://app.stockshift.io/api/v1
    description: Production
  - url: https://app.beta.stockshift.io/api/v1
    description: Beta
security:
  - apiKey: []
  - oauth2: []
tags:
  - name: Witnessed stock actions
    description: >-
      Hold a stock action for a second person, who recounts blind and signs, and
      read both signatures. Stock changes only once the witness signs.
  - name: Item stock
    description: >-
      Everything about one item's stock: where it is, what is promised, how it
      is tracked and what it costs.
  - name: Transfers
    description: >-
      Move stock from one location to another, with time in transit between
      shipping and receiving.
  - name: Landed costs
    description: >-
      Add freight, duty and other charges to the cost of stock you have
      received.
  - name: Stock counts
    description: >-
      Count what is on the shelf, compare it with what StockShift expects and
      post the difference once someone approves it.
  - name: Locations
    description: >-
      The warehouses, rooms and bins stock is kept in. Most stock calls need a
      location ID from here.
  - name: Periods
    description: >-
      Close each month once it is reported: lock what is dated in it, check
      nothing is left open and keep the stock value at its end.
  - name: Inventory imports
    description: >-
      Load opening stock from a CSV file, with a preview before anything is
      posted.
  - name: Release requests
    description: >-
      Ask QA to release stock that is on hold, and decline or withdraw the
      request. Releasing the stock closes it.
  - name: Signers
    description: >-
      Who may sign witnessed stock actions: whose identity was checked, how and
      when, and the failed signings reviewers must see.
  - name: Stock
    description: >-
      How much of each item is where. Read levels, now or at a past date, and
      post adjustments when stock is found, lost or damaged.
  - name: Witnessing rules
    description: >-
      Which stock actions wait for a second person to recount and sign, such as
      removing a controlled substance.
  - name: Allocation rules
    description: >-
      Which lots are picked first when stock is reserved or shipped, such as
      first expiry first out.
  - name: Inventory settings
    description: >-
      How the organization handles stock, such as whether stock may go negative
      and how it is costed.
  - name: Lots
    description: Batches of stock that share a lot number, and when they expire.
  - name: Movements
    description: >-
      The ledger behind every stock level. Movements are never edited; you
      correct one by reversing it.
  - name: Serial numbers
    description: Individually tracked units, and where each one is now.
  - name: Stock moves
    description: >-
      Move stock from one location to another in one step, such as from a dock
      to a shelf, and undo a move whole.
  - name: Bulk previews
    description: >-
      Check a list of stock lines before a bulk move, adjustment, hold or print,
      and see what each line needs decided.
  - name: Items
    description: >-
      The products and materials you stock, buy, make or sell. An item's ID or
      SKU is what most other endpoints ask for.
  - name: Families
    description: >-
      Groups of items that differ only by options such as size or color, and the
      variants made from them.
  - name: Catalog imports
    description: >-
      Create or update items from a CSV file, with a preview before anything is
      saved.
  - name: Custom fields
    description: >-
      Extra fields the organization adds to its items. Define them here, then
      set their values on each item.
  - name: Product library
    description: >-
      Look up a product by its GTIN and create an item from what the library
      knows about it.
  - name: Units
    description: >-
      Units of measure, such as each, box or kg. Items count in one base unit
      and convert from the others.
  - name: Scanning
    description: Turn a scanned barcode into the item, unit or labeled piece it identifies.
  - name: Suppliers
    description: >-
      The companies you buy from, the people you deal with there and what they
      charge you.
  - name: Purchase orders
    description: >-
      Orders to suppliers. Draft one, approve it, send it and receive the goods
      against it.
  - name: Purchasing imports
    description: Load suppliers and their catalogs from CSV files.
  - name: Purchasing settings
    description: >-
      How the organization buys, such as the approval threshold and how far a
      receipt may go over the order.
  - name: Receipts
    description: >-
      Goods received against purchase orders. Reverse a receipt to correct it,
      or print labels for what came in.
  - name: Item suppliers
    description: Which suppliers sell an item, and at what price.
  - name: Purchasing exports
    description: >-
      Download suppliers or their catalogs as CSV, in the same columns the
      import reads.
  - name: Sales orders
    description: >-
      Customer orders. Take one as a draft, confirm it to hold stock, then ship
      it and invoice it.
  - name: Customers
    description: The companies you sell to and the people you deal with there.
  - name: Invoices
    description: Bills for what you have sold, and the payments recorded against them.
  - name: Price lists
    description: >-
      The prices a customer pays, with quantity breaks. Give a customer a price
      list and their orders price themselves.
  - name: Quotes
    description: Offers to customers. An accepted quote becomes a sales order.
  - name: Tax rates
    description: The sales tax rates invoices are charged at.
  - name: Sales imports
    description: Load customers and price lists from CSV files.
  - name: Returns
    description: >-
      Goods customers send back: authorize the return, then receive it into
      stock and credit it.
  - name: Shipments
    description: What left the building for each sales order.
  - name: Sales settings
    description: >-
      How the organization sells, such as when stock is reserved and whether
      invoices can go out before shipping.
  - name: Certificates of conformance
    description: >-
      Signed certificates that the goods on a shipment conform to the order,
      kept exactly as they were signed.
  - name: Prices
    description: >-
      Ask what a customer would pay for a quantity of an item before you put it
      on an order.
  - name: Sales exports
    description: >-
      Download customers and price lists as CSV, in the same columns the import
      reads.
  - name: Builds
    description: >-
      Orders to make something. Release a build to the floor, issue its parts
      and complete it into stock.
  - name: Repairs
    description: >-
      Repairs of units customers send back: check the warranty, record the parts
      put in and taken out, then complete the repair or bill it.
  - name: Routings
    description: The steps a build goes through and the work center each step runs at.
  - name: Work centers
    description: The machines, cells or teams where the steps of a routing are done.
  - name: Warranty terms
    description: >-
      How long an item is under warranty and whether it counts from shipment or
      build, with terms of their own for some customers.
  - name: Genealogy
    description: >-
      Trace a lot or serial number back to what went into it, or forward to what
      it went into.
  - name: Manufacturing settings
    description: >-
      How the organization builds, such as whether operations may overlap and
      the status finished goods go into.
  - name: Scheduling
    description: Plan open builds onto working days.
  - name: Cost variances
    description: Where a completed build cost more or less than its standard cost.
  - name: BOMs
    description: >-
      Bills of materials: the parts and quantities that go into an item, kept as
      revisions.
  - name: Engineering changes
    description: >-
      Change orders that propose new BOM revisions and release them once
      approved.
  - name: Engineering imports
    description: Load bills of materials from a CSV file or a CAD export.
  - name: Engineering settings
    description: >-
      How the organization manages engineering changes, such as how many
      approvals a change order needs.
  - name: Engineering exports
    description: Download bills of materials as CSV, in the same columns the import reads.
  - name: Where used
    description: Find every BOM an item appears in, before you change or retire it.
  - name: Inspection plans
    description: >-
      What to check, on which items and how many: the characteristics, sampling
      and inspection point of each plan.
  - name: Inspections
    description: >-
      Inspections opened by receipts, operations and builds. Record their
      results to pass or fail the stock they hold.
  - name: Forecasts
    description: >-
      Expected demand for each item, week by week, and the changes planners make
      to it.
  - name: Scenarios
    description: Copies of the forecast to try out changes without touching the real plan.
  - name: Demand
    description: Past demand for an item at a location, which the forecasts are built from.
  - name: Suggestions
    description: >-
      What the plan says to buy or build. Accept one to raise the purchase order
      or build, or dismiss it.
  - name: Replenishment
    description: >-
      How each item is kept in stock at each location: reorder points, minimums
      and maximums or periodic review.
  - name: Holidays
    description: >-
      Days the organization does not work, which the plan skips when it counts
      lead times.
  - name: Planning settings
    description: >-
      How the organization plans, such as the forecast horizon and service
      level.
  - name: Automations
    description: >-
      Rules that run steps when something happens or on a schedule. Edit the
      draft, then publish it to turn it on.
  - name: Runs
    description: >-
      Each time an automation ran: what started it, what each step did and where
      it failed.
  - name: Approvals
    description: Runs paused for a person to approve or reject before they carry on.
  - name: Automation settings
    description: >-
      Organization-wide limits on automations, such as runs a minute and whether
      someone may approve their own run.
  - name: Automation templates
    description: Ready-made automations to start from.
  - name: Events
    description: >-
      The events an automation can be triggered by, and the data each one
      carries.
  - name: Step catalog
    description: Every step an automation can use and the inputs each one takes.
  - name: Views
    description: >-
      Saved reports: the dataset, filters, grouping and chart someone set up,
      ready to run again.
  - name: Dashboards
    description: Pages of charts and KPIs laid out on a grid.
  - name: Datasets
    description: >-
      The data you can report on and the fields in each. Start here to build a
      report.
  - name: Schedules
    description: >-
      Send a report by email on a schedule, or alert someone when a value
      crosses a threshold.
  - name: KPIs
    description: Single numbers worth watching, defined as a formula over a dataset.
  - name: View folders
    description: Folders that keep saved views organized.
  - name: Insights exports
    description: >-
      Export a report to a file. Large exports run in the background and are
      ready to download later.
  - name: Report templates
    description: Ready-made reports, such as stock aging, to start a view from.
  - name: Reports
    description: >-
      Run a report definition and get its rows or its chart back, without saving
      it first.
  - name: Dashboard
    description: >-
      The figures on the app's home screen, if you want to show the same numbers
      elsewhere.
  - name: Dashboard templates
    description: Ready-made dashboards to start from.
  - name: Formulas
    description: >-
      Check a formula against a dataset before you save it in a KPI or a
      calculated field.
  - name: Connections
    description: >-
      Connected accounts in other systems, what each one syncs and the history
      of its sync runs.
  - name: Shipping
    description: >-
      Carrier rates, the labels bought for orders and returns, and the scans
      that track each parcel.
  - name: Sourcing
    description: >-
      Distributor part prices and stock: search a connected distributor, link
      items to its parts and price a BOM revision.
  - name: Tax addresses
    description: The addresses a connected tax service taxes each sale by, checked with it.
  - name: Connectors
    description: The systems StockShift can connect to, and what each connector can sync.
  - name: Label sets
    description: Every batch of labels printed, so you can find it again and reprint it.
  - name: Label templates
    description: The layouts labels are printed with.
  - name: Pieces
    description: >-
      Look up a labeled piece from the code on its label: the item, lot or
      serial and how much it holds.
  - name: Branding and templates
    description: >-
      The logo, colors, terms and custom fields every quote, purchase order,
      invoice and packing slip prints with.
  - name: Mobile apps
    description: >-
      How the StockShift mobile apps enroll a device, sign in and stay in step
      with the server.
  - name: Devices
    description: >-
      The phones and scanners enrolled in the organization. Lock a lost one,
      wipe it or retire it.
  - name: Scanner setup
    description: >-
      Printable sheets of barcodes that configure a hardware scanner, and each
      person's scanner preferences.
  - name: Enrollments
    description: Make the QR codes that enroll shared devices and kiosks.
  - name: Sync feeds
    description: >-
      Download a snapshot of the data a device needs, then pull the changes
      since.
  - name: Sync commands
    description: >-
      Send the changes a device made while offline. Each command is applied
      once, however often it is sent.
  - name: Sync files
    description: Download the files, such as item images, that a feed points to.
  - name: Profile
    description: >-
      The signed-in person's own account: their details, password, passkeys,
      second factor and sessions.
  - name: Notifications
    description: >-
      The signed-in member's inbox: what needs them, what is unread, and what
      they are told about and how.
  - name: Invitations
    description: Invite people to join the organization, and accept an invitation.
  - name: Roles
    description: Roles and the permissions in each. A member can do what their roles allow.
  - name: Staff access
    description: >-
      Requests from StockShift support to look at the organization's data, which
      an owner must grant.
  - name: Team
    description: The people in the organization and the roles they hold.
  - name: API keys
    description: Create and revoke the keys scripts and integrations use to call this API.
  - name: Organizations
    description: The organizations the signed-in person belongs to.
  - name: Signatures
    description: >-
      Some actions need an electronic signature. Get a signing token here and
      send it with the call.
  - name: Registration
    description: Sign up for a new account and organization.
  - name: Organization
    description: >-
      Organization-wide policy: how long records are kept, session rules, legal
      holds and closing the organization down.
  - name: Address
    description: The billing address that appears on the organization's invoices.
  - name: History
    description: Who changed which field of a record, when and from what.
  - name: Destruction certificates
    description: Check that a certificate of data destruction is genuine.
  - name: Billing
    description: >-
      Check or change the plan, buy run packs for automations, see invoices and
      update the payment method.
  - name: Webhooks
    description: >-
      Register URLs to be told when things happen, and see each delivery and its
      response.
  - name: OAuth apps
    description: >-
      Third-party apps members have connected through OAuth. Revoke one to cut
      off its access.
  - name: REST hooks
    description: >-
      For connected apps such as Zapier: subscribe one event to a URL, and
      unsubscribe it.
  - name: MCP server
    description: >-
      Let an AI assistant work in StockShift through the Model Context Protocol,
      with the same permissions as the member who connects it.
  - name: Recent events
    description: >-
      The latest events of a type, as deliveries send them, to poll or to use as
      samples.
  - name: Webhook events
    description: Every event webhooks and REST hooks can send, with the shape of its data.
paths:
  /engineering/ecos/{eco}:
    put:
      tags:
        - Engineering changes
      summary: Change a draft engineering change order
      description: |-
        Its reason, description and BOMs are replaced. A BOM left out keeps
        the draft the ECO gave it. Needs the `engineering.ecos.manage`
        permission, a token with `engineering:write` and a plan with
        engineering change orders.
      operationId: v1.engineering.ecos.update
      parameters:
        - name: eco
          in: path
          required: true
          schema:
            type: string
      requestBody:
        required: true
        content:
          application/json:
            schema:
              $ref: '#/components/schemas/EcoRequest'
      responses:
        '200':
          description: '`EcoResource`'
          content:
            application/json:
              schema:
                type: object
                properties:
                  data:
                    $ref: '#/components/schemas/EcoResource'
                required:
                  - data
          headers:
            X-RateLimit-Limit:
              description: >-
                Requests a minute allowed for this token, or for the address
                without one.
              schema:
                type: integer
            X-RateLimit-Remaining:
              description: Requests left this minute.
              schema:
                type: integer
        '401':
          $ref: '#/components/responses/AuthenticationException'
        '403':
          $ref: '#/components/responses/AuthorizationException'
        '404':
          $ref: '#/components/responses/ModelNotFoundException'
        '422':
          $ref: '#/components/responses/ValidationException'
        '429':
          description: Too many requests
          content:
            application/json:
              schema:
                $ref: '#/components/schemas/ProblemDetails'
          headers:
            Retry-After:
              description: Seconds until the limit resets.
              schema:
                type: integer
            X-RateLimit-Limit:
              description: Requests a minute allowed.
              schema:
                type: integer
            X-RateLimit-Remaining:
              description: 'Requests left this minute: none.'
              schema:
                type: integer
      x-codeSamples:
        - lang: typescript
          label: TypeScript SDK
          source: >-
            import { StockShift } from "@stockshift/sdk";


            const stockshift = new StockShift({ token:
            process.env.STOCKSHIFT_TOKEN! });


            const result = await stockshift.put("/engineering/ecos/{eco}", {
              path: { eco: "01J8QZ4M..." },
              body: { reason: "<reason>", boms: [] },
            });
components:
  schemas:
    EcoRequest:
      type: object
      description: Why an engineering change order changes BOMs, how and which.
      properties:
        reason:
          type: string
          description: Why the BOMs change.
          maxLength: 255
        description:
          type:
            - string
            - 'null'
          description: How they change, in more detail.
          maxLength: 5000
        boms:
          type: array
          description: >-
            The BOMs it changes, from 1 to 10: each a BOM id or its item's SKU.
            Each must be released and in no other open ECO.
          items:
            type: string
            maxLength: 64
          minItems: 1
          maxItems: 10
      required:
        - reason
        - boms
      title: EcoRequest
    EcoResource:
      type: object
      properties:
        id:
          type: string
        number:
          type: string
          description: Such as ECO-00001, numbered per organization.
        status:
          type: string
          description: >-
            draft, submitted, approved, rejected, implemented or cancelled.
            While it is open (draft, submitted or approved) its BOMs are
            released only by implementing it.
        reason:
          type: string
          description: Why the BOMs change.
        description:
          type:
            - string
            - 'null'
          description: How they change, in more detail.
        required_approvals:
          type: integer
          description: >-
            How many people other than the submitter must sign it: set when it
            is submitted, the organization's setting until then.
        rejection_reason:
          type:
            - string
            - 'null'
          description: Why it was rejected.
        submitted_at:
          type:
            - string
            - 'null'
        approved_at:
          type:
            - string
            - 'null'
          description: When the last approval it needed was signed.
        rejected_at:
          type:
            - string
            - 'null'
        implemented_at:
          type:
            - string
            - 'null'
          description: When its drafts were released, all at once.
        cancelled_at:
          type:
            - string
            - 'null'
        created_at:
          type: string
        updated_at:
          type: string
        submitted_by_you:
          type: boolean
          description: Whether the caller submitted it, and so may not approve it.
        changes:
          type: array
          description: >-
            Each BOM it changes, with the redline of its draft against the
            revision it replaces.
          items:
            $ref: '#/components/schemas/EcoChangeResource'
        hidden_changes:
          type: integer
          description: >-
            How many of its BOMs are of items the caller may not see, left out
            of the changes.
        approvals:
          type: array
          description: Its signed approvals, the first first.
          items:
            $ref: '#/components/schemas/EcoApprovalResource'
        ecos_enabled:
          type: boolean
          description: >-
            Whether the plan lets the organization move ECOs; without it they
            are read-only and can only be cancelled.
        content_digest:
          type: string
          description: >-
            The SHA-256 of its canonical content: each BOM it changes, the
            revision it replaces and the revision it proposes with that
            revision's yield, lines and alternates. Costs are not part of it.
            Send it back to approve: the signature covers it.
      required:
        - id
        - number
        - status
        - reason
        - description
        - required_approvals
        - rejection_reason
        - submitted_at
        - approved_at
        - rejected_at
        - implemented_at
        - cancelled_at
        - created_at
        - updated_at
        - submitted_by_you
        - changes
        - hidden_changes
        - approvals
        - ecos_enabled
        - content_digest
      title: EcoResource
    ProblemDetails:
      type: object
      properties:
        type:
          type: string
          format: uri
          description: Links to the documentation for this code.
        title:
          type: string
          description: The HTTP status text.
        status:
          type: integer
          description: The HTTP status code.
        code:
          type: string
          description: A stable machine readable name, such as validation_failed.
        detail:
          type: string
          description: What went wrong, for people.
        errors:
          type: object
          description: >-
            Errors by field. On validation_failed, and on a refusal with a code
            of its own such as insufficient_stock or document_closed.
          additionalProperties:
            type: array
            items:
              type: string
        feature:
          type: string
          description: The plan feature needed. Only on plan_upgrade_required.
        reason:
          type: string
          description: Why a device must download a feed again. Only on resync_required.
        attempts_left:
          type: integer
          description: >-
            How many refused signatures are left before the member is locked on
            the device. Only on signature_assertion_invalid.
        rule_ids:
          type: array
          description: >-
            The witnessing rules that cover the stock. Only on
            verification_required.
          items:
            type: string
        witness:
          type: string
          description: >-
            Where the witness signs: same_device, remote or either. Only on
            verification_required.
        blind_recount:
          type: boolean
          description: >-
            Whether the witness recounts before seeing the quantity. Only on
            verification_required.
        flags:
          type: array
          description: >-
            The flags a bulk line's decisions leave open, as the bulk preview
            names them. Only on decision_required.
          items:
            type: object
            properties:
              flag:
                type: string
              facts:
                type: object
                description: >-
                  The facts of the flag, as in the bulk preview; the others are
                  null.
                additionalProperties:
                  anyOf:
                    - type: string
                    - type: integer
                    - type: array
                      items:
                        type: string
                    - type: 'null'
              choices:
                type: array
                items:
                  type: string
            required:
              - flag
              - facts
              - choices
      required:
        - type
        - title
        - status
        - code
        - detail
      title: ProblemDetails
    EcoChangeResource:
      type: object
      properties:
        id:
          type: string
        bom_id:
          type: string
        item_sku:
          type: string
        item_name:
          type: string
        base:
          $ref: '#/components/schemas/BomRevisionResource'
          description: >-
            The revision released when the BOM joined the ECO, which the draft
            is compared with.
        proposed:
          $ref: '#/components/schemas/BomRevisionResource'
          description: The draft the ECO proposes, released when it is implemented.
        lines:
          type: array
          description: >-
            The redline: the lines the draft adds, removes and changes, by
            position.
          items:
            $ref: '#/components/schemas/BomLineChangeResource'
        unchanged:
          type: integer
          description: How many lines are the same on both.
        sections:
          type: array
          description: Related data on the two revisions, such as their routings, compared.
          items:
            $ref: '#/components/schemas/RevisionSectionResource'
      required:
        - id
        - bom_id
        - item_sku
        - item_name
        - base
        - proposed
        - lines
        - unchanged
        - sections
      title: EcoChangeResource
    EcoApprovalResource:
      type: object
      properties:
        approver:
          type:
            - string
            - 'null'
          description: Who approved it; null once they are erased.
        approved_at:
          type: string
        you:
          type: boolean
          description: Whether the caller approved it.
        signed_at:
          type:
            - string
            - 'null'
          description: >-
            When the approver re-authenticated to sign, from the audit entry;
            null if the entry is gone.
        meaning:
          type:
            - string
            - 'null'
          description: What they agreed signing means.
        method:
          type:
            - string
            - 'null'
          description: 'How they re-authenticated: password, password+totp or passkey.'
        hash:
          type:
            - string
            - 'null'
          description: 'The SHA-256 of what they signed: the Action and its data.'
        content_digest:
          type:
            - string
            - 'null'
          description: >-
            The content_digest the approver signed, which the hash covers; null
            for approvals signed before content was.
      required:
        - approver
        - approved_at
        - you
        - signed_at
        - meaning
        - method
        - hash
        - content_digest
      title: EcoApprovalResource
    BomRevisionResource:
      type: object
      properties:
        id:
          type: string
        number:
          type: integer
          description: From 1, in the order the revisions were started.
        label:
          type: string
          description: A, B, C or 1, 2, 3, by the organization's setting.
        status:
          type: string
          description: draft, released or obsolete. One revision is released at a time.
        yield_quantity:
          type: string
          description: >-
            How much of the item one build of this revision makes, as an exact
            decimal.
        released_at:
          type:
            - string
            - 'null'
          description: When it took effect; null for a draft.
        obsoleted_at:
          type:
            - string
            - 'null'
          description: When the next release replaced it.
        created_at:
          type: string
      required:
        - id
        - number
        - label
        - status
        - yield_quantity
        - released_at
        - obsoleted_at
        - created_at
      title: BomRevisionResource
    BomLineChangeResource:
      type: object
      properties:
        change:
          type: string
          description: added, removed or changed.
        position:
          type: integer
          description: Where the line is, or was when it was removed.
        before:
          anyOf:
            - $ref: '#/components/schemas/BomLineResource'
              description: The line on the revision compared from; null when it was added.
            - type: 'null'
        after:
          anyOf:
            - $ref: '#/components/schemas/BomLineResource'
              description: The line on the revision compared to; null when it was removed.
            - type: 'null'
        fields:
          type: array
          description: >-
            The fields a changed line changed: component, quantity, unit,
            position, scrap_percent, reference_designators, note, phantom or
            alternates.
          items:
            type: string
      required:
        - change
        - position
        - before
        - after
        - fields
      title: BomLineChangeResource
    RevisionSectionResource:
      type: object
      properties:
        key:
          type: string
          description: 'Which it is: routing, for a routing''s operations.'
        title:
          type: string
          description: Its heading, in the reader's language.
        changes:
          type: array
          description: The entries added, removed and changed, in order.
          items:
            $ref: '#/components/schemas/RevisionEntryChangeResource'
        unchanged:
          type: integer
          description: How many entries are the same on both.
      required:
        - key
        - title
        - changes
        - unchanged
      title: RevisionSectionResource
    BomLineResource:
      type: object
      properties:
        id:
          type: string
        position:
          type: integer
          description: Unique in the BOM.
        component_id:
          type: string
        component_sku:
          type:
            - string
            - 'null'
          description: Null when the token's owner may not see the component.
        component_name:
          type:
            - string
            - 'null'
        quantity:
          type: string
          description: How much of the component one build takes, as an exact decimal.
        unit:
          type: string
        scrap_percent:
          type: string
          description: Extra allowed for scrap, as a percent.
        reference_designators:
          type:
            - string
            - 'null'
        note:
          type:
            - string
            - 'null'
        component_bom_id:
          type:
            - string
            - 'null'
          description: The component's own BOM, when it is a sub-assembly.
        phantom:
          type: boolean
          description: >-
            A sub-assembly never stocked, whose own lines are built into this
            BOM.
        alternates:
          type: array
          description: The components that may stand in for this one, by rank.
          items:
            $ref: '#/components/schemas/BomAlternateResource'
      required:
        - id
        - position
        - component_id
        - component_sku
        - component_name
        - quantity
        - unit
        - scrap_percent
        - reference_designators
        - note
        - component_bom_id
        - phantom
        - alternates
      title: BomLineResource
    RevisionEntryChangeResource:
      type: object
      properties:
        change:
          type: string
          description: added, removed or changed.
        position:
          type: integer
          description: >-
            Where the entry is, or was when it was removed, such as an
            operation's sequence.
        before:
          type:
            - string
            - 'null'
          description: The entry as it was, in a few words; null when it was added.
        after:
          type:
            - string
            - 'null'
          description: The entry as it is, in a few words; null when it was removed.
        fields:
          type: array
          description: The fields a changed entry changed, with both values.
          items:
            $ref: '#/components/schemas/RevisionFieldChangeResource'
      required:
        - change
        - position
        - before
        - after
        - fields
      title: RevisionEntryChangeResource
    BomAlternateResource:
      type: object
      properties:
        id:
          type: string
        rank:
          type: integer
          description: From 1, the first tried.
        component_id:
          type: string
        component_sku:
          type:
            - string
            - 'null'
          description: Null when the token's owner may not see the component.
        component_name:
          type:
            - string
            - 'null'
        quantity:
          type: string
          description: >-
            How much of the alternate one build takes instead, as an exact
            decimal.
        unit:
          type: string
      required:
        - id
        - rank
        - component_id
        - component_sku
        - component_name
        - quantity
        - unit
      title: BomAlternateResource
    RevisionFieldChangeResource:
      type: object
      properties:
        field:
          type: string
          description: >-
            The field, such as sequence, name, work_center, setup_minutes,
            run_minutes, instructions or files for an operation.
        label:
          type: string
          description: The field's label, in the reader's language.
        before:
          type: string
          description: Its value before, written out for reading.
        after:
          type: string
          description: Its value after, written out for reading.
      required:
        - field
        - label
        - before
        - after
      title: RevisionFieldChangeResource
  responses:
    AuthenticationException:
      description: Unauthenticated
      content:
        application/json:
          schema:
            $ref: '#/components/schemas/ProblemDetails'
    AuthorizationException:
      description: Forbidden
      content:
        application/json:
          schema:
            $ref: '#/components/schemas/ProblemDetails'
    ModelNotFoundException:
      description: Not found
      content:
        application/json:
          schema:
            $ref: '#/components/schemas/ProblemDetails'
    ValidationException:
      description: Validation error
      content:
        application/json:
          schema:
            $ref: '#/components/schemas/ProblemDetails'
  securitySchemes:
    apiKey:
      type: http
      description: >-
        For your own scripts and server-to-server integrations. Create a key in
        the app under Settings > Access > API keys and copy it then, because it
        is shown once. Send it as `Authorization: Bearer <key>`. The key acts as
        the member who made it, in the organization it was made in. A call needs
        the member's permission and one of the key's scopes, such as
        `inventory:read` or `sales:write`. A key with `*` has every scope.
      scheme: bearer
    oauth2:
      type: oauth2
      description: >-
        For apps that other people connect to their StockShift account. Use the
        OAuth 2.1 authorization code flow with PKCE (S256); there is no client
        secret. Discover the endpoints at
        `/.well-known/oauth-authorization-server` (RFC 8414) and register your
        app at `POST /oauth/register` (RFC 7591). The member chooses the
        organization and approves the scopes on the consent page, and the token
        can never do more than the member could. Send it as `Authorization:
        Bearer <token>`, as you would an API key. Access tokens last an hour;
        each refresh returns a new refresh token, so store it.
      flows:
        authorizationCode:
          authorizationUrl: https://app.stockshift.io/oauth/authorize
          tokenUrl: https://app.stockshift.io/oauth/token
          refreshUrl: https://app.stockshift.io/oauth/token
          scopes:
            access:read: Access read
            audit:read: Audit read
            address:read: Address read
            address:write: Address write
            billing:read: Billing read
            catalog:read: Catalog read
            catalog:write: Catalog write
            dashboard:read: Dashboard read
            dashboard:write: Dashboard write
            developer:read: Developer read
            developer:write: Developer write
            devices:read: Devices read
            devices:write: Devices write
            documents:read: Documents read
            documents:write: Documents write
            notifications:read: Notifications read
            notifications:write: Notifications write
            inventory:read: Inventory read
            inventory:write: Inventory write
            purchasing:read: Purchasing read
            purchasing:write: Purchasing write
            quality:read: Quality read
            quality:write: Quality write
            sales:read: Sales read
            sales:write: Sales write
            engineering:read: Engineering read
            engineering:write: Engineering write
            manufacturing:read: Manufacturing read
            manufacturing:write: Manufacturing write
            automation:read: Automation read
            automation:write: Automation write
            insights:read: Insights read
            insights:write: Insights write
            integrations:read: Integrations read
            integrations:write: Integrations write
            labels:read: Labels read
            labels:write: Labels write
            library:read: Library read
            organization:read: Organization read
            organization:write: Organization write
            planning:read: Planning read
            planning:write: Planning write
            sync:read: Sync read
            sync:write: Sync write

````

## Related topics

- [Raise an engineering change order](https://docs.stockshift.io/api-reference/engineering-changes/raise-an-engineering-change-order.md)
- [Submit a draft engineering change order for approval](https://docs.stockshift.io/api-reference/engineering-changes/submit-a-draft-engineering-change-order-for-approval.md)
- [Implement an approved engineering change order](https://docs.stockshift.io/api-reference/engineering-changes/implement-an-approved-engineering-change-order.md)


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.