Skip to main content
POST
cURL

Authorizations

Authorization
string
header
required

For your own scripts and server-to-server integrations. Create a key in the app under Settings > Access > API keys and copy it then, because it is shown once. Send it as Authorization: Bearer <key>. The key acts as the member who made it, in the organization it was made in. A call needs the member's permission and one of the key's scopes, such as inventory:read or sales:write. A key with * has every scope.

Headers

Signature-Token
string
required

A signing token for this call, from POST /api/v1/access/signatures. Each token works once.

Path Parameters

eco
string
required

Body

application/json

What an approver of an engineering change order signs: the digest of its content as they read it, so the signature covers that content.

content_digest
string
required

The content_digest of the change order as the approver read it: 64 lowercase hex characters.

Pattern: ^[0-9a-f]{64}$

Response

EcoResource

data
EcoResource · object
required