Skip to main content
PUT
cURL

Authorizations

Authorization
string
header
required

For your own scripts and server-to-server integrations. Create a key in the app under Settings > Access > API keys and copy it then, because it is shown once. Send it as Authorization: Bearer <key>. The key acts as the member who made it, in the organization it was made in. A call needs the member's permission and one of the key's scopes, such as inventory:read or sales:write. A key with * has every scope.

Path Parameters

eco
string
required

Body

application/json

Why an engineering change order changes BOMs, how and which.

reason
string
required

Why the BOMs change.

Maximum string length: 255
boms
string[]
required

The BOMs it changes, from 1 to 10: each a BOM id or its item's SKU. Each must be released and in no other open ECO.

Required array length: 1 - 10 elements
Maximum string length: 64
description
string | null

How they change, in more detail.

Maximum string length: 5000

Response

EcoResource

data
EcoResource · object
required